When we came back we were able to take a look inside and see what's changed since last week. They had a lot more of the framing done as well as the rough-in for the fireplace and much to our delight, they had the staircase in to the second floor so we were able to go up there and poke around. It's strange to walk though our house after going through the two model homes we've looked at since our house is arranged backwards inside, so it took a little bit to get our bearings. Everything looked great as far as we could tell. There were a few notes here and there from the PM pointing out some things that needed to be addressed, and we could already tell that some of them and been corrected. It's nice to have a PM that seems to be staying on top of things. They had started the HVAC install already and we could see the shingles for the roof had already been delivered, so hopefully there will be some good progress in the coming week.
Our packing progress is coming right along too. We are just about down to the necessities at this point. So Hopefully move out day will good smoothly.
21 Days Left Until Move-Out and Closing!
Now on to the part everyone wants to see, THE PICTURES!!
No comments:
Post a Comment